Competition  |  Projects  |  ATELIER 8000

ATELIER 8000   Projects   Competition

 
 

PRODUCTION COMPLEX SINOP

The architecture respects the function, production, and storing and results from operational requirements and staff needs of comfort. Standard elements are used for the structure and the envelope. Roof skylights complement a simple rectangular footprint with a gable roof. Production halls are oriented east-west and interconnected. The office building is adjacent to the hall’s south façade; it is a simple building with larger windows on the 1st floor. There is a canteen, offices, showroom on the ground floor and lockers in the basement.

 

Back

Category:Infrastructure / industry, Offices and retails
Client:SINOP REAL a.s.
Study:2013
City:Homole
GPS:48°56'18.046"N, 14°25'38.885"E
3a copy5 copy6A copy